Dredge And Rebuild
1 minute
11/11/2019
Construction work in Hampton Bays continued last Friday, as the beach west of Shinnecock Inlet was widened using dredged sand from the bottom of Shinnecock Bay.
The November 8 work was part of a month-long project to protect and strengthen the beach following destruction from three October storms. When finished, 90,000 cubic yards of sand will have been deposited on the ocean-facing beach in front of the Shinnecock Commercial Fishing Dock.